Blog

In every project, our focus is communication, meeting your objectives, and budget.

glaxios-room_102723-1_900w

Vibration Isolation for Cryo-TEM: Over 90% Measured Reduction at 2 Hzwewewe

Using a Cryo-TEM in structural biology imaging requires a stable platform to create the 3D images researchers demand. Unfortunately, many facilities that require Cryo-TEM instrumentation are in less-than-ideal locations regarding vibration.
Read more
Isolated-Foundation-Cutaway_1004237-margin_900w

Isolated Slabs: Do they work? What does the data say?wewewe

VEC works with many customers who either have installed or consider installing “Isolation Slabs” to isolate an instrument from building vibration and other sources of vibration that
Read more
All-Rooms_072423_after_grey-wall-white-bkgrd_800w

VEC Reduces Noise in Electron Microscopy Lab by 75%wewewe

In a laboratory environment, noise can be a significant problem that affects personnel comfort and instrument efficiency. Recently, a customer had a chase for an electron microscopy lab that was becoming
Read more
All-Rooms_072423_before_white-bkgrd_800w

Acoustic Noise in Laboratories: Understanding the Problem & Finding Solutionswewewe

Laboratories are places where precision and accuracy are of utmost importance. Any external factor that affects the accuracy of the results can be disastrous. One such factor that often goes unnoticed is acoustic noise.
Read more

Starting A Project?​

Contact our expert team at VEC to get started.